A new floor inside your building, without relocating

A mezzanine builds a new floor inside the warehouse and multiplies usable surface by taking advantage of height that today sits empty, without major construction and without changing buildings. It is a demountable steel structure that stands on its own columns and is assembled over the existing floor. STOKA designs, imports, installs and integrates mezzanines and steel platforms, and before quoting it verifies what decides whether the project is viable: loads, clear heights, access, fire protection and municipal permits.

Tell us your problem

Are you short of floor space, or long on unused height?

In most warehouses floor space runs out while air is left over. The operation grows sideways until nothing is left, while metres of height stay unoccupied above it. A mezzanine turns that height into usable surface, and it does so with a demountable structure that goes up in weeks and does not force you to relocate.

What a mezzanine is and what a steel platform is

In plain terms: it is a new floor, made of steel, assembled inside the building so that you can use two levels where you used one. Below, the usual operation carries on; above, you gain clear surface. It is also called a mezzanine, the international term, or a steel platform when the structure is simpler and serves a specific purpose, such as supporting a work area or giving access to a machine. The practical difference lies not in the name but in the scale and in the load it has to carry. It is a demountable structure: it stands on its own columns, is bolted together, and can be dismantled and re-erected elsewhere. That is what separates it from construction work, with everything construction implies in terms of lead time, permits and cost. Permissible load in kilos per square metre is defined by the manufacturer for each design, and at STOKA it is verified during the survey rather than estimated from a catalogue.

What goes upstairs and what stays below

A mezzanine pays off when what goes upstairs is light and handled manually. The clearest case is order picking of small items: picking shelving over two levels, with the operator working upstairs and consolidated orders coming down to the dispatch area.

Keep reading

It also works very well for offices inside the building, overlooking the operation without taking up storage surface, and for archives, which mean distributed weight, little circulation and occasional retrieval. Downstairs is where heavy and bulky goods belong, along with everything moved by forklift, because manoeuvring space and mast height need clear headroom. The most common mistake is designing a mezzanine to store upstairs exactly what is stored downstairs. When that happens, load per square metre climbs sharply, the structure becomes expensive and the project loses its edge against other ways of densifying.

What to check before quoting: loads, heights and access

First, the load the new floor will carry per square metre, which comes from the actual intended use and not from an assumption: picking small items is not the same as stacked archives or a work area with equipment. Second, clear heights, and there are two of them: the one left below and the one left above.

Keep reading

Both have to allow people to work standing up with the intended equipment; if either falls short, the project does not add up even if the structure fits. Third, access: stairs sized for the expected foot traffic, handrails, toe boards and at least one means of raising goods, whether a goods lift, a protected transfer gate or an area cleared for forklift loading. None of this is a finishing detail: it defines the project from the first drawing, which is why it is settled during the survey.

Fire protection: the item that defines the budget

This is the item that stops most projects, and it is worth putting on the table from the outset. Adding a floor changes the fire load of the sector and alters how smoke and water are distributed.

Keep reading

In practice it almost always means reworking the existing installation: sprinklers beneath the mezzanine as well as those at roof level, detection on both levels, and a review of escape routes and signage. It is not an accessory to be added later, nor something to leave for a second phase: it is construction work that must be budgeted separately, and in many cases it weighs as much as the structure itself. STOKA raises it from the diagnosis onwards, with the scope identified and set apart, so that the figure you see is the complete figure and no surprise appears halfway through assembly.

Permits, and the sum against building or renting

A mezzanine adds covered surface, and that may require a municipal procedure depending on the jurisdiction and the intended use: submission of drawings, signed structural calculations and an updated permit. It is best resolved before assembly rather than after.

Keep reading

Within that framework, the sum is done by comparing real alternatives. Building a new industrial shed costs between USD 180 and USD 430 per square metre (OneMake, June 2026), with its own lead times and permits. Renting additional premium surface in Greater Buenos Aires averages USD 7.33 per square metre per month, with the city of Buenos Aires at USD 14.52 and the Route 9 corridor at USD 5.59 (CBRE, Q2 2026), and that cost repeats every month. Adding a floor inside what you already hold competes against both options, and the structure is demountable on top of that.

Five criteria before deciding on a mezzanine

We do not publish model-by-model specification tables: the detailed sheet comes with the assessment, sized against your operation. These are the criteria the choice is made on.

Total clear height of the building
This is the criterion that decides everything. Usable height has to remain above and below at the same time, once the thickness of the structure and the deck is accounted for. If either level does not allow work standing up with the intended equipment, the project is off.
What will be stored upstairs
A mezzanine pays off with small items handled manually. The heavier and bulkier the goods you intend to lift, the higher the load per square metre demanded of the structure, and the less competitive it becomes against other ways of densifying.
Permissible load per square metre
It is defined by the manufacturer for each design according to spans, profiles and deck type, and verified during the survey. It is never taken from a generic catalogue or estimated: it is the figure that underpins the structural calculation and the professional signature.
Fire protection and evacuation
Adding a level changes the fire load of the sector and generally means reworking the installation, with sprinklers under the mezzanine and detection on both levels. It is separate construction work with its own budget, and it should be sized from the first drawing.
Status of the premises
If the building is rented, the length of the lease and the landlord permission both matter. The mezzanine is demountable, which helps, but dismantling and re-erecting carries a cost that has to be weighed in the decision.

Engineering for your operation

When is a mezzanine the wrong answer?

Our approach

It is the wrong answer when clear height is not enough for two genuinely usable levels. If, after subtracting the thickness of the structure, one level leaves nobody able to work comfortably, the surface gained is only on paper: it is used badly, used little, and ends up filled with things nobody wants to touch. It is also the wrong answer when the goods are heavy and bulky, because a mezzanine pays off with small items; for heavy pallets it is almost always better to densify upwards with racking, with or without a compact system. And it does not pay off when the building is rented on a short lease: even though the structure is demountable, assembly, fire protection and the permit procedure are not recovered in a few months. In those cases STOKA proposes redesigning the process, a different floor layout, or a racking system that uses the height without adding a walkable level.

Frequently asked questions

How much load does a mezzanine carry?

It depends on the design: permissible load in kilos per square metre is defined by the manufacturer according to spans between columns, profiles and the chosen deck type. It is not a catalogue figure valid for every case. It is set from the actual intended use and confirmed during the survey, with signed structural calculations.

Is construction work required?

The structure itself is demountable, bolted together and standing on its own columns, so it needs no major construction work. What usually does require work is the fire protection system, and in some cases localised reinforcement of the existing floor. That part is identified in the diagnosis and budgeted separately.

Can it be dismantled and moved to another warehouse?

Yes, and that is one of its advantages over traditional construction: the structure is bolted and demountable. That said, dismantling, transporting and re-erecting carries a cost, and both the fire installation and the permit procedure have to be done again at the new address. Worth weighing up if the premises are rented.

Do I need a municipal permit?

Probably. A mezzanine adds covered surface and many jurisdictions require submission of drawings, signed structural calculations and an updated permit. It varies with the municipality and the intended use. It is reviewed before assembly, because sorting it out afterwards always costs more and can halt the operation.

Let us see whether your building takes two levels

Request the survey: STOKA measures clear heights, checks the floor, defines loads and access, and tells you what scope of fire protection and permits to plan for.