References

REFERENCE INSTALLATIONS

Eight installations of the technology we integrate, across seven industries and on other continents. STOKA took part in none of them: they are published to show what the technology does and under what conditions it works. Our own projects go in the second block, with names and with figures measured on site, as clients authorize us to publish them.

Plainly

Why there are no named clients here yet

For two reasons, and neither is a shortage of projects. The first: publishing a client's name and numbers requires their written authorization, and we do not have it from anyone yet. A reference used without permission is a legal problem for whoever publishes it and a discourtesy to whoever it happened to.

The second is technical. A result without a prior measurement is not a result, it is an impression. To claim that an operation improved by 40% you have to have measured before, with the same method, over a comparable period. Where that baseline does not exist, the percentage is chosen rather than calculated.

We do not apologize for this and we do not promise a date. What follows is what can be verified today.

What can be proven does not depend on what the building is called.

Technology we integrate

Installations of the technology we integrate

They are works by the manufacturers we work with. STOKA took part in none of them: they are listed to show the reach of the technology, not as our own work.

Manufacturer installation

Textile / CarpetsThailand

Automated warehouse for high-volume carpet manufacturer

Leading textile manufacturer · Asia Pacific

AS/RS Unit-Load + Stacker Crane

A large-scale carpet manufacturer needed to triple storage capacity without expanding floor area. A 4-crane double-mast ASRS with WMS integrated to the existing ERP was implemented.

Stacker CraneIntegrated WMSStandard pallets

Relevance for Latin AmericaThe Argentine textile industry, especially in Córdoba and Buenos Aires, faces the same density challenges. This case demonstrates viability for warehouses of 2,000–8,000 m².

Manufacturer installation

Beverages / SpiritsAsia-Pacific

Automated distribution center for a premium spirits producer

Premium spirits producer · Asia-Pacífico

Pallet Shuttle + Miniload

Integration of a combined ASRS system (Pallet Shuttle for bulk stock and Miniload for box picking) in a 15,000 m² distribution center. 75% reduction in dispatch times.

Pallet ShuttleMiniloadConveyorWMS

Relevance for Latin AmericaThe wine and beverage sector in Mendoza, San Juan and Cuyo can replicate this model for high-seasonality distribution.

Manufacturer installation

Pharmaceutical / Traditional MedicineAsia-Pacific

Automated warehouse for traditional medicine laboratory

Certified pharmaceutical laboratory · Asia-Pacífico

Miniload AS/RS + Pharma WMS

Miniload implementation with batch and expiry control under GMP — the good manufacturing practices required by the health authority. Full traceability from raw material intake to finished product dispatch.

Miniload ASRSGMP WMSBatch traceabilityTemperature control

Relevance for Latin AmericaArgentine pharmaceutical laboratories, which answer to ANMAT — the national health authority —, require equivalent traceability. The system is adaptable to local regulations without major redesign.

Manufacturer installation

Pharmaceutical / Cold ChainEurope

Cold chain depot for pharmaceutical distribution

Multinational pharmaceutical distributor · Europe

Cold Storage ASRS

ASRS system specific for 2–8°C storage with real-time temperature control per position. 45% reduction in energy consumption compared to equivalent manual storage.

Cold Storage ASRSIoT monitoringPharma WMS

Relevance for Latin AmericaThe pharmaceutical cold chain in Argentina is critical. This case directly applies to distributors and laboratories in CABA, Greater Buenos Aires and Córdoba.

Manufacturer installation

Industrial ChemicalAsia-Pacific

Automated management of bulk industrial chemical raw materials

Industrial sulfate producer · Asia-Pacífico

Heavy Duty Unit-Load AS/RS

Automated storage of raw materials in big-bag and pallet format for continuous production. The system manages automatic FIFO and line replenishment without manual intervention.

Unit-Load ASRSBig-bag handlingIntegrated WMS

Relevance for Latin AmericaThe petrochemical and chemical industry in Bahía Blanca and Rosario can implement this model for raw material management and production dispatch.

Manufacturer installation

Chemical / Hazardous MaterialsEurope

Automated warehouse for hazardous products under ATEX

Chemical specialties manufacturer · Europe

ATEX ASRS + Segregation system

ASRS system with ATEX certification — the European standard for equipment working in explosive atmospheres — for storage of flammable and toxic products. Includes automatic segregation by hazard class and incompatibility management.

ATEX ASRSAutomatic segregationHazmat WMS

Relevance for Latin AmericaArgentine regulations for hazardous materials, with the standards of IRAM — the national standards institute — and of the APN, require similar controls. Chemical, paint and agrochemical industry in Greater Buenos Aires and Córdoba.

Manufacturer installation

Lubricants / PetrochemicalAsia

Automated distribution center for industrial lubricants

Industrial lubricants distributor · Asia

Pallet Shuttle + Conveyor

High-speed distribution of lubricants in multi-format containers (jerry cans, drums, IBC). The system handles 1,200 movements/hour with 99.8% accuracy.

Pallet ShuttleConveyor systemMulti-format WMS

Relevance for Latin AmericaLubricant and petrochemical distributors in Argentina with medium and large-scale operations.

Manufacturer installation

Manufacturing / Mass productionAsia-Pacific

Central warehouse for large-scale just-in-time manufacturing

Multinational component manufacturer · Asia-Pacífico

Full AS/RS + AGV + WMS

Integrated logistics center supplying 12 production lines just-in-time. The WMS coordinates AGVs, ASRS and conveyors to guarantee components on line with latency below 15 minutes.

ASRS Unit-LoadAGV fleetIntegrated conveyorJIT WMS

Relevance for Latin AmericaIndustrial parks in Buenos Aires, Córdoba and Rosario with serial production can implement this model to reduce WIP and improve OEE.

We do not publish these companies’ names because we do not have authorization to do so. Each entry states the industry, the country and the system installed; once we have the authorization, it will state the name as well.

Without a case

What you can verify today

Four things that do exist, and that you can review before deciding anything.

The method, stage by stage

The five stages of a project, what STOKA does in each one, what it needs from you and what you receive when it closes.

the method behind every project
The data we ask for, and what each item concludes

Six items and the question each one closes. It is the list that separates a diagnosis from an opinion.

what data we ask for and what each item is for
What the diagnosis delivers

Current state measured, real building capacity, a proposal ordered by stages and the order of magnitude of the investment. No closed prices.

what the diagnosis delivers
Who answers for each part

What STOKA does at each stage of the project, and what a licensed professional verifies before installation.

what STOKA does and what the manufacturers it works with do

And a concrete answer to your concrete case, within 24 business hours: whether there is anything to evaluate, which data is missing and what the next step would be.

Demonstration

The simulator on the home page

The home page has a three-dimensional simulator showing how a warehouse changes at each step: what happens when you organize it, what happens when you optimize it and what happens when you automate it.

It is a visual demonstration, with reference movements and geometry. It is not a simulation of your operation and not a projection of your results: it does not have your data. Final specifications for any equipment are those on its manufacturer's data sheet.

the visual demonstration of how a warehouse changes at each step

Criteria

How to read any supplier's reference

These five questions work for judging a case published by anyone, STOKA included. They are not an accusation against anyone: they are what has to be answerable for a number to mean something.

  1. Against what baseline is it measured?

    A -40% requires a prior value measured with the same method. If the baseline is a recollection, the percentage was chosen.

  2. Over what period?

    A peak season compared against a slow month produces any improvement you like. The period has to be declared and comparable.

  3. How much of the result comes from the system and how much from the reorganization that preceded it?

    Almost every automation project starts by cleaning up inventory and redefining storage locations. That part improves on its own, and it tends to be counted as the equipment's merit.

  4. Who took the measurement?

    It is not the same whether the supplier, the client or a third party measured it. None of those invalidates the case; not saying which one does.

  5. What did not improve?

    Every project has something that did not go as planned. A case where everything improved is a brochure.

Commitment

What we will publish once there is a STOKA case

Written in advance, so it can be held against us later.

  • The starting situation, measured before beginning and with the method declared.
  • The exact scope of what was done, and what was left out.
  • The period of the later measurement, comparable with the baseline.
  • The result, measured with the same method as the baseline.
  • What did not improve, or what turned out differently than planned.
  • The client's written authorization to publish it.

No date: it depends on a client authorizing it. A case without a baseline is not a case, and we are not going to publish one to fill this page.

SCOPE

What these projects are and where they come from

Proven technology

The technology we integrate operates in more than 30 countries, with more than 1,000 installations and more than 20 years of manufacturing track record. These are figures from the manufacturers we work with, not from STOKA.

A single point of contact

Engineering, assembly and service are the same team. Based in Mendoza, Argentina, with projects across Latin America.

STOKA projects

Projects carried out by STOKA

We do not publish any project of our own yet: we do not have one authorized by its client. When we do, it will be here with the name, the date, what was measured before, what was measured after and how it was measured. In the meantime, what you can verify today is how we work: the assessment of your operation is done with your data and at no cost.

Frequently asked questions

Because publishing a client's name and numbers requires their written authorization, and we do not have it from anyone yet. When we do, the case will be published with the prior measurement, the period and the scope in plain sight.

No. They belong to the manufacturer we work with and are labeled as such: more than 1,000 installations in more than 30 countries and five continents, with more than 20 years of manufacturing history. STOKA designs, imports, installs, integrates and supports.

A reference call also requires the client's consent, so it is arranged case by case and never offered in advance. Write to us and we will tell you clearly what we can arrange in your situation.

By the method and by the answer to your specific case: what data we ask for, what we conclude from it and what we propose. If what you need is not something we can solve well, we say so before you invest time.

The starting situation measured, the scope of what was done, the period, the result with the same measurement method and what did not improve. With the client's written authorization. A case without a baseline is not a case.

Next step

Want to know what can be donein your warehouse?

We assess your operation with your data and show you what changes, at no cost and with no commitment. We reply within 24 business hours.