How the position of each product and the picking method are decided
Slotting by rotation is defined by a criterion, not by a snapshot of Tuesday's inventory. The criterion STOKA uses is how many order lines each product appears in over a period, not units sold and not value: what makes people walk is the line, not the volume. With that order, the products with the most lines sit at hand height and close to consolidation, and the rest moves up and toward the back.
The method is chosen afterward, based on how many lines an average order carries and how much products repeat across orders: order by order when orders are large, by batch when they are short and similar to each other, by zone when one person cannot cover the whole route.
What is measured before and after, and who takes the measurement
A picking project rests on four indicators, measured the same way before and after. Time per order: picking hours divided by orders picked in the period. Orders per shift: those closed and confirmed, not those started. Lines per hour: lines picked divided by effective picking hours. Accuracy: lines picked without error over total lines picked.
STOKA does not publish a reference value for any of the four: it depends on lines per order, on the type of load and on the order the warehouse already has. The number that matters is yours. The area supervisor takes the measurement, over a full operating period and with the form left by the site survey, and repeats it the same way after the change. Two measurements taken differently say nothing about the project.