Total cost
What goes into the cost over ten years
Comparing purchase prices is the worst way to decide, because the invoice is only a fraction of what you end up paying. Total cost of ownership — TCO: what the system costs you across its whole working life — adds up equipment, civil works, integration with your systems, training, maintenance, energy, the headcount you still need, the cost of every error that reaches the customer and the cost of the hours the operation stands still. On the other side of the ledger are the square meters you stop needing: in the AMBA — the Buenos Aires metropolitan area — premium industrial space rents at USD 7.33 per square meter per month (CBRE, Q2 2026), and building a new warehouse costs between USD 180 and USD 430 per square meter (OneMake, June 2026). That calculation, run on your own numbers over ten years, is what decides.
18 to 36 monthsReference payback across the projects we assess. The figure for your operation comes from the survey, with your volumes and your costs, not from an average.
up to 66%Floor space that can be released by going upwards. Every square meter you neither rent nor build enters the ten-year calculation.
AutomaticInventory accuracy with every movement read automatically. The cost of error — returns, rework, a wrongly shipped order — is the one almost nobody budgets for.
That ten-year cost is also weighed down by response time when something fails, getting technicians to site and waiting for a spare part, and all three depend on where the engineering and the service are. Compared with European alternatives, the acquisition cost can be up to 40% lower: the difference is in the cost structure, not in technical quality.